Quality Metal Finishing

PROJECT DETAILS

10,000 square foot H3 Industrial tenant infill of existing concrete tilt-up building and site development:

CLIENT:

Quality Metal Finishing

LOCATION:

1260 Wallis St.
Eugene, OR 97402

ARCHITECT/ENGINEER:

Evergreen Engineering
1740 Willow Cr. Circ.
Eugene, OR 97402

SIZE/COST:

10,000 sq ft., $800,000

PROJECT TYPE:

Commercial

 
 

Scope

  • Preconstruction, estimating, permitting.

  • Plans, reports, compliance for Hazardous Occupancy

  • New public restrooms

  • Install new anodizing line and associated equipment

  • New water main

  • New sprinkle system

  • New 15k gallon containment tank

  • New 6 containment transfer pumps and associated piping and electrical

  • Multiple 2-hour fire separations

  • Two New 3000 SF concrete caustic containment reservoirs

  • Install all cranes, chillers, air scrubbers, water distillation systems, commercial low-temp boilers, backup generators, flow pumps, mechanical ventilation, and pump distribution to caustic chemical recycling center

 

Project Gallery

View other Industrial Projects

View All
Previous
Previous

Bobahead, Corvallis OSU Campus

Next
Next

Papa's Pizza Coburg Rd