Oakridge School District CTE Improvements
13,000 square foot seismic retrofit of existing school wood, metal, plastics shop classrooms
Preconstruction, estimating, permitting
Plans, reports, compliance for Hazardous Occupancy
Fabricate and install new portal frames in existing and new demoed openings
Demolition of existing hollow CMU and infill with new shear walls
New storefront between shop spaces
New power distribution to machinery and welding stations
New lighting
New 90 minute coil fire door with fuse link
New sprinkle system
New sawdust baghouse
Fab and install New Portal Frames at new openings
Seismic bracing of existing CMU walls and lateral bracing of existing building elements
PROJECT DETAILS
CLIENT:
Oakride School District
Reta Doland
(541) 782-2813
LOCATION:
507 Wilamette St.
Eugene, OR 97401
ARCHITECT/ENGINEER:
Pivot Architecture
44 W. Broadway #300
John Stapleton
(541) 342-7291
SIZE/COST:
13,00 sq ft., $418,336
PROJECT TYPE:
Commercial