Yoncalla Elementary
Provided preconstruction, construction, and closeout services related to the seismic retrofit of an existing reinforced concrete masonry unit gymnasium, which included:
Preconstruction and estimating
Constructability reviews for engineer
Permitting
Development of Project Schedule
CM/GC Preconstruction/ Construction Method
New roofing package
New window package in paths of egress
The installation of seismic attachments at the existing roof structure and the top of wall as well as at the foundation and base of wall
Installation of new shear walls and reinforced existing ones
Poured new concrete footings and concurrently:
Erected new steel “moment frames” on the building’s exterior breezeway
PROJECT DETAILS
CLIENT:
Yoncalla School District #32
LOCATION:
401 1st St.
Yoncalla, OR 97499
ARCHITECT/ENGINEER:
ZCS Engineering
127 NW D St.
Grants Pass, OR 97526
SIZE/COST:
$1.2 Million
PROJECT TYPE:
CM/GC Preconstruction/Construction Method