Yoncalla Elementary

Provided preconstruction, construction, and closeout services related to the seismic retrofit of an existing reinforced concrete masonry unit gymnasium, which included:

  • Preconstruction and estimating

  • Constructability reviews for engineer

  • Permitting

  • Development of Project Schedule

  • CM/GC Preconstruction/ Construction Method

  • New roofing package

  • New window package in paths of egress

  • The installation of seismic attachments at the existing roof structure and the top of wall as well as at the foundation and base of wall

  • Installation of new shear walls and reinforced existing ones

  • Poured new concrete footings and concurrently:

  • Erected new steel “moment frames” on the building’s exterior breezeway

 

PROJECT DETAILS

CLIENT:

Yoncalla School District #32

LOCATION:

401 1st St.
Yoncalla, OR 97499

ARCHITECT/ENGINEER:

ZCS Engineering
127 NW D St.
Grants Pass, OR 97526

SIZE/COST:

$1.2 Million

PROJECT TYPE:

CM/GC Preconstruction/Construction Method