Harrisburg Elementary

Provided preconstruction, construction, and closeout services related to the seismic retrofit of an existing concrete gymnasium, which included:

  • Construction Estimating

  • Preconstruction and estimating

  • Development of Project Schedule

  • Infilling of existing openings in the concrete structure

  • Pouring concrete footings for “strongbacks”

  • Crane-erecting of new steel “strongbacks” on the interior of the gymnasium for the purpose of bracing the existing concrete structure

  • Rehabilitation of existing timber roof trusses

  • New roofing package

  • Seismically isolating adjacent structures to the gymnasium

 

PROJECT DETAILS

CLIENT:

Harrisburg School District #41

LOCATION:

642 Smith St.
Harrisburg, OR 97446

ARCHITECT/ENGINEER:

ZCS Engineering
127 NW D St.
Grants Pass, OR 97526

SIZE/COST:

$1.2 Million

PROJECT TYPE:

CM/GC Preconstruction/Construction Method