Head Start Whiteaker

Head start -Whiteaker Walk-in Cooler / Freezer -Kitchen Improvements

  • Self performed 85% of the work

  • Fabricated and installed new Portal frame

  • New walk-in concrete pad

  • New concrete equipment pad with new connections to storm

  • Installed owner provided walk-in cooler / freezer

  • Furnish and installed new exhaust fan for kitchen

  • Design, fabricated and installed custom steel outdoor gazebo

  • Installed new back bar equipment

  • Demo

 

PROJECT DETAILS

CLIENT:

Head Start Of Lane County / City of Eugene

LOCATION:

21 N Grand St Eugene

ARCHITECT/ENGINEER:

Rowell

Brokaw

SIZE/COST:

$153,390

PROJECT TYPE:

MEP / General Construction


Gallery block below. Double click for panel pop up and then upload photos you’d like displayed in this gallery.

Previous
Previous

Elkton Oregon Farm Steel Structure Addition

Next
Next

CW Walker Park Street ( Small Project)